Our process
Five clear steps. No surprises.
Solar goes wrong when nobody owns the whole job. We stay with you from the first bill review to the yearly health check, and tell you exactly what happens at each stage.
At a glance
Sunrise to sunset, one advisor.
- 01Day 1
Free consultation & bill review
We read 12 months of your electricity bills, understand how you use power and tell you honestly if solar makes sense.
- 02Days 2–4
Site survey & shadow analysis
A consultant visits your roof, measures usable area, checks structure and maps shade from trees, tanks and neighbouring buildings.
- 03Week 1–2
System design & honest quote comparison
We size the system to your real bill, not the biggest one an installer can sell, and compare quotes from vetted installers line by line.
- 04Weeks 2–5
Subsidy filing & installation supervision
We register and file your PM Surya Ghar application, then supervise the installer on site so the work matches the design.
- 05Weeks 5–8
Net-metering, handover & yearly health check
We follow up with your DISCOM for net-metering and inspection, hand over every document, and check your system’s health every year.
Step by step
What happens, and what you get.
- 01Day 1
Free consultation & bill review
We read 12 months of your electricity bills, understand how you use power and tell you honestly if solar makes sense.
- Bill & load analysis (units, sanctioned load, tariff slab)
- Goals: lowest bill, backup, or both
- Straight answer on whether solar is worth it for you
- 02Days 2–4
Site survey & shadow analysis
A consultant visits your roof, measures usable area, checks structure and maps shade from trees, tanks and neighbouring buildings.
- Roof measurement & photos
- Shade path through the year
- Structure, waterproofing and earthing check
- 03Week 1–2
System design & honest quote comparison
We size the system to your real bill, not the biggest one an installer can sell, and compare quotes from vetted installers line by line.
- Right-sized design with expected generation
- Brand-neutral panel and inverter shortlist
- Side-by-side quote comparison, no hidden extras
- 04Weeks 2–5
Subsidy filing & installation supervision
We register and file your PM Surya Ghar application, then supervise the installer on site so the work matches the design.
- Portal registration, feasibility and documents
- Quality checks on structure, wiring and earthing
- Snag list closed before sign-off
- 05Weeks 5–8
Net-metering, handover & yearly health check
We follow up with your DISCOM for net-metering and inspection, hand over every document, and check your system’s health every year.
- Net-meter application and DISCOM inspection
- Subsidy tracked until it reaches your bank
- Annual performance and safety check
Handover
Everything in one file, in your name.
When the system is commissioned you receive a complete handover file, so you never depend on one installer’s goodwill again.
As-built drawings
Layout, string diagram and single-line diagram of what was actually installed.
Warranty documents
Panel, inverter and structure warranties, registered in your name.
Test & commissioning report
String voltages, insulation and earthing readings at handover.
Subsidy & net-meter records
Portal application, commissioning certificate and DISCOM approvals.
Expected generation sheet
Month-by-month units to expect, so you can spot a problem early.
Care guide & contacts
Cleaning routine, what the inverter lights mean, and whom to call.
Our promise
If solar isn’t right for you, we’ll say so.
Sometimes the roof is too shaded, the bill too small or the structure needs work first. When that happens we tell you plainly at step one, before you spend a rupee. That honesty is the whole point of hiring a consultant.
Callback within 4 hours of your enquiry.
Not sure where to start? Start with your bill.
Send us your last electricity bill. A consultant will tell you, for free, what size system fits and what you could save.